Deer Park Secondary School is a modern, purpose-built School which opens in September 2021
We are part of RAISE Education Trust which includes Boorley Park School and Wildern Secondary School. This is an exciting time for the trust and all colleagues present and future.
Deer Park School has 7 forms of entry and was built to fill the basic need for more school places. It has capacity for 1050 students and potential for future expansion.
It is located at the heart of the Uplands Development in Hedge End and backs onto a Site of Important for Nature Conservation (SINC).
The school consists of two buildings – the main school building, which is three storeys high and a separate two storey Sports Hall building.
The majority of our new international faculty now come to us through Schrole. In fact, our school exclusively uses Schrole as our global recruitment tool, having tried and stopped using other sites. This is how much faith we have in Schrole as a valuable resource with good customer service.
Donald Holder
Foreign Principal
Tsinghua International School, Daoxiang Lake
Your browser is outdated. For the full experience please update.